jcb121
05-02-2012, 02:36 AM
I got lots of my parts water cut, so the spindle mounts are the correct shape, all that is needed is a few holes need to be drilled so I can attach it to my gantry.
it will basically be...
one side flattened as water cutting leaves a taper, the are to be flattened will be 10mm x 120mm.
2 holes 100mm apart on the spindle clamp.
4 holes (2 each side) on the "u" shaped part of the spindle holder, again 80mm apart.
the holes in 5mm so they can be tapped or drilled out.
then times that by two as there are 2 spindle clamps!
If anyone could do this for them then that would be fantastic!
I really need this done for college, not only to gloat about my superior equipment at home, but to do work and get distinctions.
Postage shouldn't be much for the two bits.
it will basically be...
one side flattened as water cutting leaves a taper, the are to be flattened will be 10mm x 120mm.
2 holes 100mm apart on the spindle clamp.
4 holes (2 each side) on the "u" shaped part of the spindle holder, again 80mm apart.
the holes in 5mm so they can be tapped or drilled out.
then times that by two as there are 2 spindle clamps!
If anyone could do this for them then that would be fantastic!
I really need this done for college, not only to gloat about my superior equipment at home, but to do work and get distinctions.
Postage shouldn't be much for the two bits.